Our client had an outdated, old family kitchen and the whole space was in dire need of modernisation. The overall flow of the space needed attention as well as updating the old appliances to modern models.


We had an initial meeting with the client to go through their ideas and talk about any inspirations they had and also any specific requirements they wanted in the finished kitchen.


Once we had a feel for what they wanted, we came up with a few different designs (using the latest computer software so our client could get the best representation of the finished product as possible). The client loved the visuals and agreed upon one design which we then had manufactured by MasterClass Kitchens.


Our expert team of tradesmen then got to work installing the kitchen and as you can see from the finished photos, it looks stunning!

 

Hamilton Case Study Circle Pics

Project Details

LOCATION: Hamilton

PROJECT SPECIFICATION: Masterclass H-Line Kitchen in Sutton Grey with Graphite Handle Rail. Masterclass worktops in 19mm Carrara Marble.

PROJECT BUDGET: £20-30k

INITIAL TIMEFRAME: 4 week – 6 weeks

FINISHED TIMEFRAME: 3 weeks from design concept approved to final completion. (Delay on doors from the Manufacture resulted in a 1 week delay).